• About
  • Portfolio
  • Videos
  • Shop
  • Blog
  • Press
  • Contact
  • Skip to main content
  • Skip to footer

studio | ten | 25

  • About
  • Portfolio
  • Videos
  • Shop
  • Blog
  • Press
  • Contact

April 3, 2016

Published: April 3, 2016, By Abbe Fenimore

Walls, Windows & Doors

The Garage Apartment Remodel is moving along great and it is starting to take shape. The framing is up, the window is in and the front door has been placed! Now that the pluming has come to a stopping point the guys are able to get all of the new walls, electrical and other framing details in place. Hopefully the rain stays way long enough to have the french drain put in so that we can keep on rockin!

 

Here are the latest changes! You can now see where the bathroom & closet will be. The door and window were placed and the exterior siding has gone up! Up next, sheetrock, cabinets and exterior paint!!

 

thumb_IMG_1625_1024 thumb_IMG_1626_1024 thumb_IMG_1514_1024 thumb_IMG_1770_1024 thumb_IMG_1810_1024

More from the Blog

TIME FOR TABLESCAPES

WORKING PRETTY

BETH DUTTON’S BEDROOM – YELLOWSTONE

Footer

Let’s Get Started

Let us make your dream space a reality.
Contact Us

abbe@studioten25.com
214.763.3040

Follow Us

  • Facebook
  • Instagram
  • Pinterest
  • TikTok

BLOG

The blog is back! Follow us on social media and come back often for the lastes updates.
Shop the blog

© Copyright Studio | Ten | 25 · All Rights Reserved · Website by Simply Design